Search Allegheny Treasures
Post Calendar
November 2026 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 - Follow Allegheny Treasures on WordPress.com
-
Archives
Tag Archives: Smart Grid cost overruns
I know going from $15.3 to $42.1 Million seems like a lot in 1 year Commissioner, but this Smart Grid stuff is really confusing.
So, feeling pretty good about future energy cost estimates, are we? Check this out this little ditty from the Boulder Colorado Daily Camera and then let me know how you feel: When Boulder was chosen for the smart grid project … Continue reading
Posted in Electric Grid
Tagged Boulder Colorado Smart Grid, Smart Grid cost overruns, SmartGridCity
Leave a comment